Search
70 Tonne Crane at Rayleigh, Essex
- Craig Herbert
- Mar 16, 2017
- 1 min read
We had a 70 tonne crane at our site in Essex. The crane was present to lift in a lorry load of new timber for the timber framing team. It was also used to move some steel structures in to position.

The crane with a lorry load of timber:

The crane lifting the first load of timber:

The timber delivery is lifted on to the construction site, ready for the timber framers:

The slideshow below shows the crane lifting a steel structure into position:
Comments